Spacer Spacer Spacer Spacer Spacer Spacer
Spacer
Spacer Spacer Spacer
Spacer Barrier Systems Inc. Spacer   Call 1(888) 800-3691 Search:    Go Spacer
 
Spacer Spacer Spacer
Spacer Spacer
Spacer
Spacer
Spacer
Spacer Spacer Success Stories
 
Spacer Spacer Spacer Spacer
Spacer Spacer Spacer Spacer Spacer
Spacer Home  
SpacerProducts and Services 
SpacerSuccess Stories 
  ArrowArlington, VA  
  ArrowAuckland, NZ  
  ArrowBoston, MA  
  ArrowDallas, TX  
  ArrowHonolulu, Hawaii  
  ArrowLong Island, NY  
  ArrowManhattan, NY  
  ArrowMontreal, Canada  
  ArrowSan Diego, CA  
  ArrowTappan Zee Bridge, NY  
  ArrowWashington, D.C.  
SpacerBuying 
SpacerTraffic Facts 
SpacerNews 
SpacerAbout BSI 
SpacerContact Us 
Spacer
Spacer
Spacer
Spacer
Spacer
Spacer Spacer Spacer Spacer
Spacer
 
Spacer Spacer Spacer Spacer
    Arlington, VA
When widening a critical three-mile corridor, Virginia DOT used QMB to expand the workzone and finish 5 months early.
Spacer
    Auckland, NZ
Using moveable barrier as a reversible lane median has reduced overall accidents and eliminated crossover accidents.
Spacer
    Boston, MA
Two barrier transfer machines move 12 miles of barrier 14 feet laterally twice a day to smooth traffic by creating contraflow HOV lanes in peak directions.
Spacer
    Dallas, TX
10 years of successful contraflow HOV lane implementation using moveable barrier to increase traffic throughput.
Spacer
    Honolulu, Hawaii
After reviewing successful applications in other cities, Hawaii DOT implemented a nine-mile contraflow lane using moveable barriers.
Spacer
    Long Island, NY
QMB redirects traffic twice a day to expand the worksite for resurfacing during off-peak traffic hours to speed construction.
Spacer
    Manhattan, NY
Highway reconstruction utilized QMB to provide positive barrier protection to workers while minimizing traffic delays.
Spacer
    Montreal, Canada
QMB was critical to completing the highway reconstruction on time while moving 200,000 vehicles per day through the workzone.
Spacer
    San Diego, CA
Crossover accidents were eliminated and peak hour traffic congestion has been reduced.
Spacer
    Tappan Zee Bridge, NY
Traffic bottlenecks are neutralized with barrier, moved twice a day to create an extra reversable median lane in the peak direction.
Spacer
    Washington, D.C.
QMB was the "Fast Build" solution to reconstruct an elevated section of I-395 while providing positive protection to workers.